Code Test Designation
Norm
A Soils
A.1 1) Wet Particle Size Analysis by sieving
1) E 239-1970
A.2 2) Proctor Compaction Test
2) E 197-1970
A.3 3) Modified Proctor Compaction Test
3) Internal Proc.
A.4 4) Determination of CBR
4) E 198-1967
A.5 5) Sand Equivalent
5) E 199-1967
A.6 6) Liquidity Limit
6) E 143-1969
A.7 7) Plasticity Limit
7) E 143-1969
A.8 8) Dry sample preparation
8) E 195-1966
A.9 9) Particle Density Determination
9) E 83-1965
A.10 10) "IN SITU" determinação of dry density
10) E 204-1967
A.11 11) Road Classification
11) E 240-1970
A.12 12) Unified Classification
12) ASTM D 2487-85
A.13 13) Water Content
13) NP 84-1965
B Aggregates
B.1 14) Particle Size Analysis
14) NP 1379-1976
B.2 15)Determination of Volumic Masses and Water Absorption for crushed stone and pebbles 15) NP 581-1969
B.3 16) Determination of Volumic Masses and Water Absorption for sands
16) NP 954-1973
B.4 17) Water Content - Surface and total
17) E-249 – 1971
C Concrete
C.1 18) Study of the Composition of fresh concrete with description of aggregates
18) Internal Proc.
C.2 19) Simple Compression
19) E 226-1968
C.3 20) Slump 20) NP 87-1964
C.4 21) Extraction of laboratory samples of projected concrete
21) Internal Proc.
C.5 22) Sampling, Slump, Cure and Simple Compression
22) Internal Proc.
C.6 23) Calibration of Concrete Production Plant
23) Internal Proc.
C.7 24) Processing of Statistics
24) Internal Proc.
C.8 25) Conformity Report
25) ENV 206-1993
D Bituminous Mixtures
D.1 26) Particle Size Analysis
26) EN NP 933-1
D.2 27) Execution of laboratory samples 27) JAE P. 14-53
D.3 28) Marshall Compression Test
28) NP 142-1968
D.4 29) Determination of Bitumine Content
29) ASTM D2172
D.5 30) Determination of Density of compacted mixture
30) ASTM D2726
E General Services
E.1 31) Gathering of Samples
-
E.2 32) On-site technical assistance - dislocation (1 Hour)
-
E.3 33) Following Hours
-
F Special Geotechnical Prospecting
F.1 34) SPT Tests
-
F.2 35) Lugeon permeability tests
-